Out at St Clair today, on the esplanade are two large shipping containers loaded with all the gear to do strengthening of the piles on the ramp, which has been out of use since way back last year. I spoke to the guys working on it, and they said they are being strengthened, and then the ramp will be re-extended so it can be used again and that there are no plans at present to fix the washed away stairs. Stuck in a cool pic of one of the stripped and twisted bolts from the bottom of the stairs that got washed away a few weeks ago.
0 comments:
Post a Comment