The sand loss on Ocean Beach over winter months (July especially) has now been largely recovered. In the interim, the damage to the Reno mattresses (that provides protection to the toe of the dune at Middle Beach) was repaired, as was damage to that section of the rubble wall that had been uncovered. The repaired Reno mattresses and the reinstated rubble wall have been re-covered by sand, and the remaining machinery has now been removed from the beach.
Monitoring of sand levels will go on, and the maintenance regime will also continue on an 'as required' basis as the information gathering process concludes. The Project Team appointed to draft the Long Term Management Plan is now meeting on a regular basis, while the program for completing the studies of the beach, adjacent off shore environment, as well as the eventual preparation of the Plan itself, remains on track.